English: Project Roadmap (2026–2028)

Phase 1: Foundation & Community (Months 1–6)

  • Legal: Incorporate the Non-Profit Association (A.C.) in Mexico.
  • Fundraising: Hit the “Soft Cost” goal on GoFundMe.
  • Recruitment: Interview and select the first 10 “Founding Members.”
  • Site Selection: Secure the land and complete due diligence.

Phase 2: Design & Permitting (Months 7–15)

  • Architecture: Finalize blueprints for the 40 units and Eco-Smart systems.
  • Government: Secure “Uso de Suelo” (Zoning) and environmental permits.
  • Pre-Sales: Founders place their initial deposits to trigger the construction loan/capital.

Phase 3: Construction (Months 16–30)

  • Infrastructure: Drill the well, install the solar array and greywater wetlands.
  • Building: Groundbreaking of the Central Hacienda and residential wings.
  • Interior: Fit-out of the Medical Hub and communal kitchen.

Phase 4: Commissioning & Move-In (Months 31–36)

  • Staffing: Hire and train the 24/7 care team.
  • Ceremony: Grand opening and “Legacy Brick” installation.
  • Homecoming: The first residents move into their new Chosen Family home.

Español: Cronograma del Proyecto (2026–2028)

Fase 1: Cimentación y Comunidad (Meses 1–6)

  • Legal: Constitución de la Asociación Civil (A.C.) en México.
  • Recaudación: Alcanzar la meta de “Gastos Operativos” en GoFundMe.
  • Reclutamiento: Entrevistar y seleccionar a los primeros 10 “Miembros Fundadores”.
  • Terreno: Asegurar el predio y realizar la debida diligencia legal.

Fase 2: Diseño y Tramitología (Meses 7–15)

  • Arquitectura: Finalización de planos para las 40 unidades y sistemas Eco-Smart.
  • Gobierno: Obtención de licencias de construcción y permisos ambientales.
  • Preventa: Los fundadores realizan depósitos iniciales para activar el capital de construcción.

Fase 3: Edificación (Meses 16–30)

  • Infraestructura: Perforación de pozo, instalación de paneles solares y humedales.
  • Obra Negra/Gris: Inicio de obra de la Hacienda Central y las alas residenciales.
  • Equipamiento: Instalación del Centro Médico y la cocina industrial.

Fase 4: Entrega y Mudanza (Meses 31–36)

  • Personal: Contratación y capacitación del equipo de cuidados 24/7.
  • Ceremonia: Gran inauguración e instalación del “Muro del Legado”.
  • Bienvenida: Los primeros residentes se mudan a su nuevo hogar de Familia Elegida.

Français : Calendrier du Projet (2026–2028)

Phase 1 : Fondation et Communauté (Mois 1 à 6)

  • Juridique : Constitution de l’Association Civile (A.C.) au Mexique.
  • Financement : Atteindre l’objectif des “frais de lancement” sur GoFundMe.
  • Recrutement : Entretiens et sélection des 10 premiers « Membres Fondateurs ».
  • Terrain : Sécurisation du terrain et vérifications techniques.

Phase 2 : Conception et Permis (Mois 7 à 15)

  • Architecture : Finalisation des plans des 40 unités et des systèmes Eco-Smart.
  • Administratif : Obtention du permis de construire et des autorisations écologiques.
  • Préréservation : Les fondateurs versent leurs dépôts initiaux pour lancer le capital de construction.

Phase 3 : Construction (Mois 16 à 30)

  • Infrastructure : Forage du puits, installation solaire et système de recyclage des eaux.
  • Gros œuvre : Construction de la Hacienda centrale et des ailes résidentielles.
  • Aménagement : Équipement du centre médical et de la cuisine commune.

Phase 4 : Mise en service et Emménagement (Mois 31 à 36)

  • Équipe : Embauche et formation du personnel de soins 24h/24.
  • Cérémonie : Grande inauguration et pose de la « Brique de l’Héritage ».
  • Installation : Les premiers résidents emménagent dans leur nouveau foyer de Famille de Cœur.