English: Project Roadmap (2026–2028)
Phase 1: Foundation & Community (Months 1–6)
- Legal: Incorporate the Non-Profit Association (A.C.) in Mexico.
- Fundraising: Hit the “Soft Cost” goal on GoFundMe.
- Recruitment: Interview and select the first 10 “Founding Members.”
- Site Selection: Secure the land and complete due diligence.
Phase 2: Design & Permitting (Months 7–15)
- Architecture: Finalize blueprints for the 40 units and Eco-Smart systems.
- Government: Secure “Uso de Suelo” (Zoning) and environmental permits.
- Pre-Sales: Founders place their initial deposits to trigger the construction loan/capital.
Phase 3: Construction (Months 16–30)
- Infrastructure: Drill the well, install the solar array and greywater wetlands.
- Building: Groundbreaking of the Central Hacienda and residential wings.
- Interior: Fit-out of the Medical Hub and communal kitchen.
Phase 4: Commissioning & Move-In (Months 31–36)
- Staffing: Hire and train the 24/7 care team.
- Ceremony: Grand opening and “Legacy Brick” installation.
- Homecoming: The first residents move into their new Chosen Family home.
Español: Cronograma del Proyecto (2026–2028)
Fase 1: Cimentación y Comunidad (Meses 1–6)
- Legal: Constitución de la Asociación Civil (A.C.) en México.
- Recaudación: Alcanzar la meta de “Gastos Operativos” en GoFundMe.
- Reclutamiento: Entrevistar y seleccionar a los primeros 10 “Miembros Fundadores”.
- Terreno: Asegurar el predio y realizar la debida diligencia legal.
Fase 2: Diseño y Tramitología (Meses 7–15)
- Arquitectura: Finalización de planos para las 40 unidades y sistemas Eco-Smart.
- Gobierno: Obtención de licencias de construcción y permisos ambientales.
- Preventa: Los fundadores realizan depósitos iniciales para activar el capital de construcción.
Fase 3: Edificación (Meses 16–30)
- Infraestructura: Perforación de pozo, instalación de paneles solares y humedales.
- Obra Negra/Gris: Inicio de obra de la Hacienda Central y las alas residenciales.
- Equipamiento: Instalación del Centro Médico y la cocina industrial.
Fase 4: Entrega y Mudanza (Meses 31–36)
- Personal: Contratación y capacitación del equipo de cuidados 24/7.
- Ceremonia: Gran inauguración e instalación del “Muro del Legado”.
- Bienvenida: Los primeros residentes se mudan a su nuevo hogar de Familia Elegida.
Français : Calendrier du Projet (2026–2028)
Phase 1 : Fondation et Communauté (Mois 1 à 6)
- Juridique : Constitution de l’Association Civile (A.C.) au Mexique.
- Financement : Atteindre l’objectif des “frais de lancement” sur GoFundMe.
- Recrutement : Entretiens et sélection des 10 premiers « Membres Fondateurs ».
- Terrain : Sécurisation du terrain et vérifications techniques.
Phase 2 : Conception et Permis (Mois 7 à 15)
- Architecture : Finalisation des plans des 40 unités et des systèmes Eco-Smart.
- Administratif : Obtention du permis de construire et des autorisations écologiques.
- Préréservation : Les fondateurs versent leurs dépôts initiaux pour lancer le capital de construction.
Phase 3 : Construction (Mois 16 à 30)
- Infrastructure : Forage du puits, installation solaire et système de recyclage des eaux.
- Gros œuvre : Construction de la Hacienda centrale et des ailes résidentielles.
- Aménagement : Équipement du centre médical et de la cuisine commune.
Phase 4 : Mise en service et Emménagement (Mois 31 à 36)
- Équipe : Embauche et formation du personnel de soins 24h/24.
- Cérémonie : Grande inauguration et pose de la « Brique de l’Héritage ».
- Installation : Les premiers résidents emménagent dans leur nouveau foyer de Famille de Cœur.